Buy ARINC Guidance For Tool And Test Equipment (Tte) Equivalency from SAI Global. mended in the amm, equivalency must be established by following the detailed guidance provided in the arinc report. , “guidance for tool and test equip. ARINC Uploaded by Anonymous QFuHHlM. ARINC Report Copyright: © All Rights Reserved. Download as PDF or read online from Scribd. Flag for.

Author: Arashijar Gugis
Country: Sudan
Language: English (Spanish)
Genre: Personal Growth
Published (Last): 19 December 2018
Pages: 197
PDF File Size: 16.18 Mb
ePub File Size: 1.11 Mb
ISBN: 276-3-54022-160-7
Downloads: 52058
Price: Free* [*Free Regsitration Required]
Uploader: Arashinris

Some avionics units can be updated via onboard loading, but in cases where an avionics unit is removed from the aircraft, shop technicians must be able to reload the software into the unit.

Another problem with previous versions of ARINC was that manufacturers would send incomplete information to the operator or third-party TPS provider. The title also will change to reflect a wider scope: As the mounting features of are identical to those of Boeing C the accuracy specifications for these features are as specified by Ainc in Ref B.

Specifications Measurement Distance between actuator mount centreline and fixed distance block. It was felt that this situation was unachievable. The analysis of the EFICD schematic and the ATE test procedure delivers sufficient information for an equivalent test solution using a locally fabricated adapter box, standard power supplies, digital multimeter for voltage and current measurements and an ARINC reader.

How incomplete requirements are supplemented? Category 4 — TTE, sufficient technical information not available This category includes both generic and special equipment required for performing specific tasks where the data is insufficient to define the task requirements or TTE capabilities.

  GSM NETWORKS PROTOCOLS TERMINOLOGY AND IMPLEMENTATION GUNNAR HEINE PDF

ARINC | Guidance For Tool and Test Equipment (TTE) Equivalency | Document Center, Inc.

Therefore, this document was written to address the equivalency based on a specific task, a group of tasks, applications, or group of applications i. The tools are to be sent to an approved calibration vendor for calibration. Any substantive changes will require submission to the relevant subcommittee for incorporation into a subsequent Supplement.

Because it was published afterARINC contains parts that overlap with some of the material in Yes No Evaluation completed by: In the “more electric” aircraft, for example, the hydraulic system will be connected to an actuator that is controlled by an electronic module, using fly-by-wire technology, instead of a mechanical link.

In order to facilitate the continuous product improvement of this ARINC Standard, two 686 are included in the back of this volume: The pace of technological evolution constantly accelerates.

Modify dash 7 base by machining slot 11 x 0. The alternate solution is an existing fixture used for similar maintenance tasks. More detail needed 4.

ARINC REPORT ()_图文_百度文库

Today, the major U. The output of this process step is the set of Alternate Tool Specifications and Procedures. BMH 53 The output of this process step is the set of Alternate Tool Requirements.

These activities directly support airline goals: The maintenance task 6688 revised and successfully performed using the applicable aircraft parts. The measurements obtained are compared to specifications listed in the CMM.

arrinc On both tools Boeing C rod end cap is attached to the end of the actuator to simplify taking the measurement to the rod end bearing centreline.

  CLIVE BARKER DAMNATION GAME PDF

According to Mueller, while ARINC simply offers guidelines for testing, adding the standard into those documents ensures that the revision will be binding in future purchase agreements. WithBatson says, the group decided “not to specify what language to use from one system to the next.

Product Focus: Expanding Scope of ARINC 625 Test Equipment

The links to the local quality management system? This is typically referenced in the component maintenance manual CMMas well, Mueller says.

Deferred for later consideration – the project is not deemed of sufficient urgency to be placed on the current calendar of activities but will be reconsidered at a later date? This exceeds 68 recommendations contained in ISO Evaluation criteria will include: Appendix C contains a sub-set of the arlnc that would be included in an equivalency technical data file for a simple device.

A Fluke 87 ariinc multimeter, tool number 52 was selected to perform voltage and current measurements. Prioritization of effort Implementation schedule Define organization s responsible for determining equivalence Roles and responsibilities defined for each organizational element Define qualifications for personnel authorized to determine equivalency Process fully documented within the MRO organization Process linked to Quality Management System QMS – QMS should refer to the TTE equivalency process – QMS should define how the external suppliers comply with the equivalency process 4.

If it does not, revise as required and repeat the process.